RMM Lending
USDC / USDSBorrow assets
IsolationCollateral mode
30-60%LTV ramp
| Collateral | Stage | Pre-CofC LTV | Operating LTV | Health factor |
|---|---|---|---|---|
| LVT001 | pre-construction | 30% | 55% | 1.80 |
| LVT002 | pre-construction | 35% | 60% | 1.90 |
| LVT003 | pre-construction | 40% | 55% | 2.00 |
| LVT004 | pre-construction | 30% | 60% | 2.10 |
| LVT005 | pre-construction | 35% | 55% | 2.20 |
| LVT006 | pre-construction | 40% | 60% | 2.30 |
| LVT007 | pre-construction | 30% | 55% | 2.40 |
| LVT008 | pre-construction | 35% | 60% | 2.50 |
| LVT009 | pre-construction | 40% | 55% | 2.60 |
| LVT010 | repositioning | 30% | 60% | 2.70 |
| LVT011 | pre-construction | 35% | 55% | 2.80 |
| LVT012 | pre-construction | 40% | 60% | 2.90 |